Bertling was asked to handle the transportation of a complete lay system weighing over 2,000Te from the UK to a shipyard in Indonesia.
POL: UK
POD: Indonesia
Industry: Chemical
Volume: 16,774 cubic meters, with the heaviest piece weighing 478Te
SOW: shipment execution, with close involvement in the pre-planning and supervision
Bertling offices involved: Middlesbrough, Jakarta
Bertling was asked to handle the transportation of a complete lay system weighing over 2,000Te from the UK to a shipyard in Indonesia. The client had originally planned to equip a new lay vessel at the port where the flexible lay system was being constructed. The entire shipment comprised 16,774 cubic meters with the heaviest piece weighing 478Te.