We are pleased to share a recent project success involving the ongoing shipment of HDPE pipes from the United States to Suriname for one of our key clients.
This long-term sub-project, running through November 2026, requires consistent handling of high-volume cargo with continuous inbound and outbound flows. With weekly truck arrivals and immediate export preparations, the project demands precision, coordination, and operational efficiency at every stage.
Our team is managing door-to-port services, including indoor storage, transloading, and OOG technical loading and lashing—ensuring a smooth and reliable supply chain throughout the project lifecycle.
POL: Miami, USA
POD: Paramaribo, Suriname
Industry: Infrastructure / Energy
Volume: 35,965 meters of HDPE pipe (ongoing shipments; 15–18 truckloads per week)
Bertling Team: Bertling Miami