Bertling successfully managed a recent part charter shipment from Singapore to Brazil. The operation involved grillage and support beams of substantial volume and weight, requiring fast mobilisation, tight coordination, and seamless execution across all involved teams.
Despite an activation window of less than one week, the cargo was collected, prepared, and loaded on schedule.
POL: Singapore
POD: Brazil
Industry: Project Logistics / Energy
Volume: 116 packages, 329,600 kg, 1,979.88 cbm loaded on 50 x 40’HC
Bertling Team: Global Operations & Logistics Teams