Bertling Shanghai and Bertling Singapore joined forces to seamlessly deliver a complex pressure vessel shipment from South Korea to China.
By smartly parceling cargo together at the load port, our teams maximized vessel utilization and secured a more efficient and competitive freight solution.
POL: South Korea
POD: China
Industry: Oil & Gas
Volume: 5 Packages / 262,838 MT / 521 CBM
Largest Piece: 21.46 x 276.3 x 371.4 m / 220.22 m3
Heaviest Piece: 206.642MT
Bertling Team: Shanghai and Singapore
Despite tight timelines and short-notice vessel and barge bookings, Bertling achieved a seamless port-to-door delivery.
Detailed project planning, close coordination with shipper and consignee, and in-house technical expertise in lifting, lashing, and stowage ensured safe, efficient, and on-time execution. A strong example of teamwork, smart parceling, and Bertling’s project logistics expertise in action.