Bertling Aberdeen recently completed a move of suction piles and subsea equipment from Egypt to West Africa. Assisted by our engineering department in Middlesbrough and our team in Cairo, we successfully managed the shipment consisting of items up to 17m high and 175t through a complex delivery method and strict handling procedures.
POL: Egypt
POD: West Africa
Volume: Total volume approached 9,000 cbm
Bertling Team: Bertling UK and Bertling Egypt
This shipment required intensive engineering oversight and supervision.
All parties performed and coordinated to a high standard, and Bertling once again led the way in terms of safety, efficiency, and professionalism.